RU  EN
 
 
 
 
Project name Project client Performed work Date of commissioning
Construction of the 110/10 kV Igorevsky Woodworking Plant substation, Smolensk Region, Holm-Zhirkovsky District, Igorevskaya station.
Details
State client Smolensk Region Capital Construction DepartmentPerformed work:
Supply of equipment;
Construction and assembly work;
Installation and wiring work
Start-up and adjustment work
December 2010
Construction of the first line of the Vladimir Electric Motors Plant 110/10kV substation, Ivanovo Region

Brief technical characteristics:
110/10kV substation 2 25000 kVA

Details
LLC Volzhsky Electro-Metallurgical PlantPerformed work:
Supply of equipment;
Construction of the Vladimir Electric Motors Plant 110/10 kV substation on a turnkey basis, Ivanovo Region, city of IvanovoLLC Volzhsky Electro-Metallurgical PlantPerformed work:
Survey and design work;
Construction and assembly work;
Installation and wiring work
Start-up and adjustment work;
At present
Development of design documentation and performance of surveys for the construction of power supply networks, Lipetsk Region, city of Lipetsk
Details
OJSC Lipetsk Industrial Production Special Economic ZonePerformed work:
Design and survey work;
December 2009
Development of the detailed design of the 110/10 kV Svetlaya substation (OJSC Igorevsky Woodworking Plant), Smolensk Region., Holm-Zhirkovsky District, Igorevskaya StationOJSC Igorevsky Woodworking PlantPerformed work:
Design and survey work;

Project details:
Development of the detailed design: provision of the necessary facilities for the infrastructure utilities of the project Expansion of OJSC Igorevsky Woodworking Plant. Construction of fibreboard mill (MDF). 110/10 kV Igorevsky Woodworking Plant substation with 110 kV overhead approach lines.
September 2010
Discharge of the work of the 35/10 kV Stora Enso substation, Kaluga Region, city of Balabanovo

Brief technical characteristics of the substation:
New construction of 35/10 kV substation, capacity of 4000 kVA

Details
LLC Stora Enso Packaging BBPerformed work:
Installation and wiring work
Start-up and adjustment work
December 2007
Drafting of the design documentation of the main step-down station (GPP) 220kV Polyvinyl chloride (PVC) Production Complex with a capacity of 330,000 tonnes a year. Nizhny Novgorod Region, city of KstovoCJSC Petrotechnip Performed work:
Survey and design work;
At present
Drafting of the design specifications and estimates for the construction of a substation, Tambov Region, Inzhavinsky DistrictBranch of OJSC IDGC of the Centre – TambovenergoPerformed work:
Survey and design work;

Project details:
Drafting of the design specifications and estimates for the construction of 110/35/10 kV substation for the poultry farm of Inzhavinsky District of Tambov Region
At present
Expansion and reconstruction of 110 KV outdoor switchgear, 220 kV Pobeda substation, Tver Region, city of Rzhev
Details
FGC UES OJSC, represented by director of the branch of OJSC ECMC UES - Engineering and Construction Management CentrePerformed work:
Design and survey work
Supply of power equipment
Construction and assembly work
Installation and wiring work
Start-up and adjustment work
Second quarter of 2009
Expansion of 110kV outdoor switchgear for the 220 kV MashZavod substation for the connection of 110kV MashZavod – Nationalnaya overhead line, Bryansk Region, city of BryanskBranch of OJSC ECMC UES – ECMC of the North-WestPerformed work:
Design and survey work

Equipment:
Outdoor switchgear -110 package transformer substation of Samara Electroshield (CJSC Samara Electroshield Group-TM Samara);
Disconnect switches - —110 (CJSC Samara Electroshield Group-TM Samara);
Circuit breakers LTB-145 (LLC ABB);
Current transformers TG-145 (LLC ABB);
Voltage transformers -110 (OJSC Ramensky Electrical Engineering Plant ENERGIA);
Relay protection and emergency controls (LLC EKRA Research and Production Enterprise);
May 2008
Mini-CHP for CJSC DaimlerChrysler Automobiles RUS, city of MoscowOJSC GazEnergoStroyPerformed work:
Supply of power equipment
Installation and wiring work
Start-up and adjustment work

Supplied equipment:
Low-voltage complete device RU-0.4 kV Prisma Plus series (LLC BaltEnergoMash);
December 2006
New construction of 110/35/6 Natsionalnaya Substation, 110 kV overhead line, Bryansk Region, city of Bryansk

Brief technical characteristics of the substation:
110/6 kV substation, capacity 2 40,000 kVA

Details
OJSC Mortgage Corporation of Bryansk RegionPerformed work:
Design and survey work
Supply of equipment
December 2008
New construction of 220/10 kV substation, Volgograd region, city of KotelnikovoEuroChem-VolgaKaliy LLCPerformed work:
Performance of design, design documentation stage;

Project details:
Design for the facility 220/10 kV GOK substation for the Gremyachinskoe potash development (220 kV gas-insulated switchgear and control gear)
At present
New construction of the 110/35/6kV Mogutlorskaya substation, 110 kV overhead line, Tyumen Region, Novoagansk urban settlement.

Brief technical characteristics of the substation:
110/35/6 kV substation, capacity of 2 10000 kVA;
110 kV overhead line, 12km long;
OJSC Aganneftegazgeologiya Diversified CompanyPerformed work:
Design and survey work
October 2007
New construction of the oil transfer pumping station NPS-17 220/10 kV substation, 220 kV overhead line, Republic of Sakha (Yakutia), city of Aldan

Project details:
External supply of electricity to the first line of the Eastern Siberia Pacific Ocean pipeline system
Brief technical characteristics:
220/10 kV substation, capacity of 2 40000 kVA

Details
LLC Eastern Siberia Pacific Ocean Project Management CentrePerformed work:
Supply of equipment
Installation and supervision
December 2008
New construction: 110/6 kV substation, main step-down station GPP-14, OJSC Karelsky Okatysh, Republic of Karelia, city of Kostomuksha
Details
Karelsky OkatyshSupply of power equipment
Construction and assembly work
Installation and wiring work
Start-up and adjustment work
August 2, 2006
Operational dispatch and technical maintenance, 20 kV distribution centre, 20 kV cable lines, Kaluga region, city of KalugaKaluga Region Development Corporation (OJSC)Performed work:
Operational dispatch service;
Technical maintenance;
At present
Performance of survey and design work, Smolensk Region, city of Roslavl

Project details:
Reconstruction of the 110/35/10 kV Roslavl substation
Branch of OJSC IDGC of the Centre – SmolenskenergoPerformed work:
Design and survey work;
December 2011
Performance of survey and design work, Smolensk Region, city of Smolensk

Project details:
Construction of the 110/10/10 kV Milovidovo substation in the city of Smolensk
Branch of OJSC IDGC of the Centre - SmolenskenergoPerformed work:
Design and survey work;
December 2011
Performance of survey and design work, Smolensk Region, city of SmolenskBranch of OJSC IDGC of the Centre – SmolenskenergoPerformed work:
Design and survey work;

Project details:
Reconstruction of the 110/35/10 kV Zavodskaya substation
December 2011
Performance of survey and design work, Smolensk Region, city of SmolenskBranch of OJSC IDGC of the Centre – SmolenskenergoPerformed work:
Design and survey work;

Project details:
Reconstruction of the 110/6 kV Zapadnaya substation
December 2011
Performance of survey and design work, Smolensk Region, city of SmolenskBranch of OJSC IDGC of the Centre – SmolenskenergoPerformed work:
Design and survey work;
December 2011
Performance of survey and design work, Smolensk Region, city of VyazmaBranch of OJSC IDGC of the Centre – SmolenskenergoPerformed work:
Design and survey work;

Project details:
Reconstruction of the 110/10 kV Vyazma-2 substation
December 2011
Performance of survey and design work, Smolensk Region, village of NovoduginoBranch of OJSC IDGC of the Centre – SmolenskenergoPerformed work:
Design and survey work;

Project details:
Reconstruction of the 110/35/10 kV Novodugino substation
December 2011
Project work on the construction of 110/6 kV Solovi substation with 110 kV overhead line, Bryansk Region, city of BryanskCJSC Samara Electroshield Group-TM SamaraPerformed work:
Design and survey work;

Project details:
Performance of the project relating to the construction of 110/6 kV Solovi substation with 110 kV overhead line to comply with the requirements of the branch of OJSC IDGC of the Centre - Bryanskenergo.
December 2007
Reconstruction of 110/35/6 kV substation No. 2, Tambov Region, city of Tambov
Details
OJSC IDGC of the Centre Tambovenergo branchPerformed work:
Supply of power equipment
Construction and assembly work
Installation and wiring work
Start-up and adjustment work
December 2008
Reconstruction of 6 kV switchgear and control gear: power section, relay protection and emergency controls, auxiliary transformer of OJSC Zagorskaya Pumped Storage Power Plant (OJSC Zagorskaya PSPP), Moscow Region, Bogorodskoye settlement, Sergiev Posad districtBranch of RusHydro OJSC Zagorskaya PSPPPerformed work:
Supply of equipment;
Construction and assembly work;
Installation and wiring work
Start-up and adjustment work;

Installed equipment:
Switchgear and control gear -6 kV units -68 with vacuum circuit breakers - (CJSC Samara Electroshield Group-TM Samara);
December 2011
Reconstruction of relay protection at the 110/35/6 kV Safonovo substation, 110 kV overhead line of the Kompressornaya Substation - Safonovo Substation, Smolensk Region, Holm-Zhirkovsky District
Details
Branch of OJSC IDGC of the Centre – SmolenskenergoPerformed work:
Supply of equipment;
Construction and assembly work;
Start-up and adjustment work;
At present
Reconstruction of the 110/35/10 kV Martynovskaya substation, Rostov Region, city of TsimlyanskOJSC IDGC of the South – RostovEnergoPerformed work:
Supply of equipment;
Construction and assembly work;
Installation and wiring work
Start-up and adjustment work;

Installed equipment:
Cabling and wiring products (LLC Rybinsk Cable Plant)
July 2011
Reconstruction of the 110/6 kV Steklozavodskaya main step-down station on a turnkey basis, Ivanovo Region, city of IvanovoAGC BGW OJSC Bor GlassworksPerformed work:
Design and survey work;
Supply of equipment;
Construction and assembly work;
Installation and wiring work
Start-up and adjustment work
September 2010
Reconstruction of the diagram for supply of electricity to Chepetsky Mechanical Plant, Udmurt Republic, city of GlazovCJSC TVEL-INVESTPerformed work:
Supply of equipment;
Installation and supervision work;

Installed equipment:
10 kV switchgear, SM6 (Schneider Electric);
Transformer substation 2 2500 kVA (BaltEnergoMash LLC);
October 2010
Reconstruction of the instrument channels of 35-750 kV substations of the branches of FGC UES OJSC – Backbone Electric Grids of Ural and Backbone Electric Grids of Western Siberia
Details
LLC Engineering Centre EnergoauditcontrolPerformed work:
Design and survey work;
At present
Reconstruction of the relay protection and automation of the overhead line 110 kV Kompressornaya – Safonovo (overhead line 110 kV 153) at the 220 kV Kompressornaya substation, Smolensk Region, Holm-Zhirkovsky District, Igorevskaya StationOpen Joint Stock Company Federal Grid Company of Unified Energy SystemPerformed work:
Design and survey work;
November 2011
Reconstruction of the transformer substation -130 for the Summer Camp for the Federal Protection Service, Moscow Region.Federal Protection Service of the Russian FederationPerformed work:
Design and survey work
Supply of equipment
Construction and assembly work
Installation and wiring work
Start-up and adjustment work

Installed equipment:
Low-voltage switchgear: Prisma Plus on automatic circuit breakers, (LLC BaltEnergoMash);
December 2009
Reconstruction of the transformer substation, Albino facility for the Federal Protection Service, Moscow Region.Federal Protection Service of the Russian FederationPerformed work:
Supply of equipment
Construction and assembly work
Installation and wiring work
Start-up and adjustment work

Installed equipment:
Low-voltage switchgear: Prisma Plus on automatic circuit breakers, (LLC BaltEnergoMash);
400 kVA transformers (Production Republican Unitary Enterprise Minsk Electrotechnical Plant named after V.I. Kozlov);
December 2009
Reconstruction of transformer substations -19, -20. External and internal electricity supply networks. Udmurt Republic, city of Izhevsk
Details
CJSC Udmurneft-BureniePerformed work:
Survey and design work;
Supply of equipment;
Construction and assembly work;
Installation and wiring work
Start-up and adjustment work
August 2011
Reconstruction: Radiozavod Substation No. 67, Republic of Karelia, city of Petrozavodsk
Details
Branch of IDGC North-West-Karelenergo110/10 kV substation, capacity 2 25,000 KVA
December 2007
Supply of accumulator battery for the 110/10/6 kV Airport substation No. 800, Sheremetyevo, city of Moscow

Project description:
Replacement of accumulator batteries to increase system reliability for operational direct current (SODC) to comply with the requirements of the branch of OJSC FGC UES – Backbone Electric Grids of the Centre
OJSC Moscow United Electric Grid CompanyPerformed work:
Supply of power equipment
Construction and assembly work
Start-up and adjustment work

Supplied equipment:
Accumulator batteries 8OSP.HC 280, (HOPPECKE);
July 2008
Supply of electricity to section four of the Grabtsevo technology park, 20kV distribution centre, 20 kV cable lines, Kaluga Region.

Brief technical characteristics :
20 kV distribution centre capacity 20 MVA
20 kV cable line, 3km long
Telecommunications line 3 km

Details
Kaluga Region Development Corporation (OJSC)Performed work:
Design
Supply of power equipment
Construction and assembly work
Installation and wiring work
Start-up and adjustment work
Commissioning
November 2009
Supply of equipment and performance of work, Krasnodar Territory, city of Sochi

Brief technical characteristics:
Rectifier charger D400G216/200
OJSC Sochi CHPPerformed work:
Supply of power equipment
Installation and wiring work
Start-up and adjustment work

Installed equipment:
Rectifier charger D400G216/200, (HOPPECKE);
August 2006
Supply of equipment for the reconstruction of outdoor switchgear of 110 kV Tamboskaya substation No. 8, Tambov Region, city of TambovOJSC IDGC of the Center – TambovEnergoPerformed work:
Supply of equipment;
Installation and supervision work;
December 2009
Supply of modular package transformer substation 10/0.4 for OJSC Lipetsk Industrial Production Special Economic Zone, Lipetsk Region, city of Lipetsk

Brief technical characteristics:
Two modular package transformer substation in concrete casing -GLAR-1000/10/0.4
Two modular package transformer substation in concrete casing -GLAR 630/10/0.4
Two modular package transformer substation in concrete casing -GLAR 160/10/0.4
Two and three modular phase implementation
Overall dimensions – 6,300 7,500, including dedicated subscriber part

Details
OAO Lipetsk Industrial Production Special Economic ZonePerformed work:
Supply of modular package transformer substation
Installation and supervision work
December 2008
Supply of modular package transformer substation 10/0.4 for the motor vehicle testing ground of the Federal Protection Service, Moscow Region.
Details
Federal Protection Service of the Russian FederationPerformed work:
Design and survey work
Supply of modular package transformer substation
Construction and assembly work
Installation and wiring work
Start-up and adjustment work
September 2008
Supply of modular package transformer substation 10/0.4 for the vacation home of the Federal Protection Service, Moscow Region.

Brief technical characteristics of the substation:
Two modular package transformer substations -GLAR-630/10/0.4
Three modular implementation phase
Overall dimensions – 6,300 7,500, with dedicated subscriber section

Details
Federal Protection Service of the Russian FederationPerformed work:
Design and survey work
Supply of modular package transformer substation
Construction and assembly work
Installation and wiring work
Start-up and adjustment work
September 2008
Supply of modular package transformer substation 10/0.4 for Vnukovo International Airport, city of Moscow
Details
LLC MonoLitStroyPerformed work:
Supply of modular package transformer substation
Construction and assembly work
Installation and wiring work
Start-up and adjustment work
December 2009
New construction
Verkhnevolzhsk Brick Plant 110/10 kV substation, Tver Region, city of Rzhev
Details
LLC Verkhnevolzhsk Brick PlantPerformed work:
Supply of power equipment
Construction and assembly work
Installation and wiring work
Start-up and adjustment work
Second quarter of 2009
 
   
     
 
Copyright 2000-2015 Engineering Energon
Central Office:
2/16, 2nd Yuzhnoportovy Proezd
115088, city of Moscow,
E-mail: sales@energon.ru